Edgewater ContractElevating Environments. Empowering Partnership. DESIGN RESOURCE
Help Me Find a Solution
← Design Journal
Planning guides / Grand Rapids Chair

Coordinate communal-table power before the furniture order

Use Grand Rapids Chair’s Clyde resources to coordinate outlet locations, power-module choices and installation responsibilities for workplace cafés and shared touchdown tables.

By Edgewater Design Journal · AI-assisted editorial
Published

Put devices into the furniture brief

A communal table may support lunch at noon and laptop work an hour later. Before selecting integrated power, ask the end user which activities the table must accommodate and what people will bring with them. List laptops, phones and any shared equipment, then ask the dealer to identify the connection types available in the proposed module.

Grand Rapids Chair’s Clyde product page lists power as a standard option, with choices of two power receptacles or a receptacle combined with USB-A and USB-C charging. Its October 2026 price list itemizes those modules separately. Ask the dealer to show the chosen modules explicitly in the quotation, including quantity and finish, so the approved package is clear.

Choose the module position with the seating plan

The Clyde price list describes one center power location, or two end locations on rectangular tables at least 60 inches long. Show the intended choice on a scaled plan with the actual table dimensions and seating arrangement. Ask the designer to review where people sit, where devices rest and how charging leads will reach the modules.

For a long table, compare the proposed module positions with the expected mix of individual and group use. Ask whether a person seated at either end can connect without routing a lead through someone else’s workspace. Also discuss how serving trays, bags and everyday cleaning will interact with the selected locations. These are project-planning questions to resolve with the team before the configuration is approved.

Trace the connection to building power

The published Clyde price list describes each module as individually powered by a 108-inch cord with a 120-volt plug. Give that information to the facilities team, installer and responsible electrical professional. Ask them to verify the proposed connection against current manufacturer instructions and the building conditions.

Place the table and nearby building receptacles on the same coordination drawing. Have the team establish the intended cord route and review how it relates to chair movement, circulation and housekeeping access. If the furniture may move for events, ask what reconnection process the operating team will use. Resolve any required building work and assign responsibility before fixing the installation date.

Release one coordinated package

Keep the table model, top size, height, material, module selection and placement together in the purchasing record. Request the current installation information and confirm any configuration restrictions with the manufacturer. Have the dealer identify which work is included in the furniture installation scope and which tasks need another project-team member.

At handover, give facilities staff the approved configuration and manufacturer operating instructions. Ask the installer and responsible project team to confirm that the table is in its agreed location and the power arrangement has been completed as specified. Confirm current pricing, availability and delivery assumptions for the selected package. Edgewater can help connect dealers and designers with Grand Rapids Chair resources for the remaining specification questions.

Bring the conversation to your project.

Edgewater Contract connects dealers, designers and commercial end users with represented furniture manufacturers across Southern California, Hawaii, Nevada and Arizona. Territories vary by manufacturer.

Connect with Edgewater ↗Explore the inspiration gallery ↗